It is the fixed power for the FixedPowerConstantFlow condition. It should be provided and its unit is W. Positive value means extracting energy from the soil.
Additional info
From ProcessLib/HeatTransportBHE/BHE/CreateFlowAndTemperatureControl.cpp line 66
- This is a required parameter.
- Data type:
double
- Expanded tag path: processes.process.HEAT_TRANSPORT_BHE.borehole_heat_exchangers.borehole_heat_exchanger.flow_and_temperature_control.FixedPowerConstantFlow.power
- Go to source code: → ogs/ogs/master
Used in the following test data files